2.2.12. Check of the operating oil valve (OCV) (L3)
Disconnect a negative wire of the rechargeable battery.
Disconnect the socket of the operating oil valve.
Fig. 2.103. Installation of special adaptation
|
Measure resistance between conclusions of A and B ohmmeter (fig. 2.103).
If the result of measurement differs from specified, replace the operating oil valve.
Fig. 2.117. Conclusions of the socket of the operating oil valve (OCV)
|
The standard characteristic of indications of an ohmmeter – 6,9–7,9 Ohms.